Water Upgrade Weeks 5-7

The water plant is no stranger to contractors these days. The concrete pads have been filled and cured. Four pressurized tanks have been installed. One electric motor and vertical turbine pump installed. Variable Frequency Drives (VFDs) have been installed and … Continue reading